Concrete foundations across Toronto and the GTA
Clear scope|Written quotations
Clear scope|Written quotations

Barrie footings, foundation walls and slabs

Concrete contractors in Barrie

Barrie is a single-tier city, so it handles permits itself through APLI, its online portal, with questions going to Service Barrie. Grand Structural Services (GSS) pours the footings, foundation walls and garage and basement slabs underneath, including foundations for the extra units Barrie now allows. We work in Allandale, the East End, Painswick, Ardagh and Holly.

Get a free quote

Takes 30 seconds. Upload your drawings for a faster price. We reply the same day.


Prefer to talk? Call (416) 785-7838

Our own forms

No waiting on rental stock or another crew

Pour date in writing

The date we give you is the date we pour

WSIB cleared and insured

$2 million liability, certificates on request

Supply and install

Custom rebar and concrete at bulk pricing, one source

What do our concrete contractors in Barrie build?

We pour concrete footings and piers, concrete foundation walls in poured concrete or ICF, and garage and basement slabs for homes and additions in Barrie. For parking garages and commercial buildings, we also do concrete repair and parking garage restoration. We use our own crews and our own forms, and we follow your engineer’s drawings. Before you build, read how deep footings go in Ontario and what a concrete foundation costs in Toronto, or see all the areas we serve.

Concrete piers on an industrial project in Orillia, Ontario

Footings and piers

From strip and pad footings to stepped footings and piers, for homes and additions in Barrie. More on footings

Rebar cage set inside the forms, with base plates installed after, for a commercial building in Barrie, Ontario

Foundation walls

Our forms, our pour: foundation walls with waterproofing and weeping tile. More on foundation walls

Basement slab poured in a new home in the GTA

Garage and basement slabs

Basement floors, slabs on grade, and suspended slabs for garages. More on slabs

Foundation work for a rear, side and garage extension in the GTA
Base prepared for a basement floor slab
Our crane truck that carries our own forming system

One schedule

One company pours the footings, walls and slab, so nothing waits between pours.

Our projects

Recent work

Our wall forms and column cages on an industrial site
Foundation walls stripped and ready for backfill
Concrete footings poured for a new home
Long run of poured concrete walls on a large site
New foundation walls, with a stone slinger placing gravel before the basement slab
Footings and foundation for a double house in Toronto
Deep foundation walls waterproofed, column forms beside them
Foundation walls stripped with gravel placed inside, Toronto
Concrete footings for a home in the Beaches, Toronto

More of our work

Footings and foundation for a double house in Toronto
Concrete footings for a home in the Beaches, Toronto
Rebar set for a suspended garage slab in the GTA
Rebar reinforcing for an industrial suspended slab
New foundation walls, with a stone slinger placing gravel before the basement slab
Foundation walls stripped with gravel placed inside, Toronto
Foundation work for a rear, side and garage extension in the GTA
Base prepared for a basement floor slab
Our wall forms and column cages on an industrial site
Long run of poured concrete walls on a large site
Deep foundation walls waterproofed, column forms beside them
Waterproofed deep foundation walls with column forms, Toronto
Foundation walls stripped on a large home
Waterproofing going onto new foundation walls
Stripped concrete foundation walls for a large home in Toronto
Placing a basement slab over radiant heat panels
Poured footing with rebar dowels for the foundation wall
Drainage membrane on new foundation walls, gravel base inside
New foundation walls waterproofed before backfill
Concrete stairs formed and reinforced, ready to pour
Tall poured concrete foundation wall
Waterproofed corner of a new foundation wall
Footings poured while the crew finishes up
Waterproofing membrane on new concrete foundation walls in the GTA
Footing rebar laid in a long trench
Concrete wall poured in a trench on a commercial site in Toronto
Column rebar standing on a poured footing in Mississauga
ICF foundation walls going up for a new home in the GTA
Concrete footings poured for a new home
Footings poured with rebar dowels set for the foundation walls
Reinforced footing forms set inside a building
Foundation walls in winter, with forms stacked to move
Concrete footings formed for a new home in Toronto
Pump truck filling our foundation wall forms on pour day
Concrete slab on grade
Foundation wall forms set for a new build
Wall forms in a narrow trench, freshly poured
Footing forms laid out on a new home dig in the GTA
Foundation wall forms braced for the pour
Wall forms and column rebar set for a concrete pour
Foundation work for a home addition
Foundation walls stripped with gravel placed inside
Concrete pier with a steel bearing plate
Reinforcing detail for a retaining wall foundation
Waterproofed foundation walls on a winter job in Toronto
Poured foundation walls just stripped
Finished edge of a concrete slab on grade
Foundation work for a rear, side and garage addition
Poured wall in a long trench with column forms set
Braced wall forms ready for concrete on a GTA site
Footing forms beside an existing house for an addition in Toronto
Finishing a freshly poured concrete footing
Preparing the base for a basement floor slab in a new home
Industrial foundation for a 16-foot-high retaining wall
Placing a basement floor slab over radiant heat panels
Concrete foundation walls between two houses in Toronto
Footing forms set below grade for a deep basement
Poured foundation walls with waterproofing in Toronto
Column rebar cage inside the forms
Wall rebar tied inside the forms
Concrete foundation wall forms set for a basement in Toronto
Footing reinforcing set beside an existing foundation wall
Deep foundation walls waterproofed, with column forms set next to them
Poured foundation walls with a ladder down into the basement
New foundation walls, with a stone slinger placing gravel before the basement slab
Waterproofed foundation wall beside the backfill trench
Commercial concrete wall poured in a trench, GTA
Concrete piers on an industrial project in Orillia, Ontario
Concrete foundation walls just stripped
Placing concrete over a rebar mat for a slab
Concrete foundation walls stripped for a new home in the GTA
Foundation walls stripped on a large site
Foundation wall corner just stripped, Toronto
Concrete wall poured in a trench on a commercial job in the GTA
Foundation walls for a new custom build in downtown Toronto
Smooth poured concrete wall face after stripping, Toronto
Foundation walls stripped and ready for backfill
Concrete footing forms and rebar ready for the pour in Toronto
Footing forms with rebar mats set
ICF foundation walls going up for a new home
Screeding the top of a concrete footing pour
Basement floor slab poured over radiant heating, GTA
Foundation walls stripped with gravel inside, GTA
Concrete going into the forms from the truck chute
Foundation walls with exterior waterproofing membrane
Concrete pump boom over our wall forms on pour day in Toronto
Reinforced concrete retaining wall
Footing forms set for a new foundation in the GTA
Footing forms and rebar on pour day with the pump line in place
Slab concrete placed around column rebar
Rebar cage set inside the forms, with base plates installed after, for a commercial building in Barrie, Ontario
Concrete wall and column forms on a commercial job
New concrete walls and footing at a step in the foundation
Long poured concrete wall in a trench on a commercial job
Our numbered wall forms, set and braced in Toronto
Poured trench footing with dowels for the wall, Toronto
Small waterproofed concrete pit beside a new foundation

Why GSS

What homeowners and builders get with GSS

Footing to slab in Barrie, on one schedule: footings, foundation walls, and garage and basement slabs, all on our own forms.

01

Your schedule stays on track

We own our forming system, so your pour never waits on a rental yard or another crew’s calendar.

02

One company, footing to slab

One contract covers footings, walls and slabs. No gaps between trades and no blame over walls out of square.

03

Built right, inspected at every stage

Built to your engineered drawings. Footings are inspected before every pour, and walls are checked against the drawings before we strip.

04

You’re covered on every job

WSIB cleared with $2 million in liability insurance. Certificates on request, before we start.

Barrie, Kempenfelt Bay and two watersheds

Barrie is a single-tier city. It sits inside Simcoe County on the map but isn’t part of the county government, so the City handles permits itself, through APLI.

Most of Barrie drains to Kempenfelt Bay and Lake Simcoe, under the Lake Simcoe Region Conservation Authority. The west part of the city is in the Nottawasaga Valley Conservation Authority’s watershed.

The photo shows a rebar cage set inside the forms for a commercial building in Barrie.

Rebar cage set inside the forms, with base plates installed after, for a commercial building in Barrie, Ontario
Footings poured with rebar dowels set for the foundation walls

New homes and additions in Barrie

Barrie gets colder winters and more snow than Toronto, which makes frost protection and cold-weather concreting more important. We plan heating, blankets and curing into every winter pour there.

We work across Barrie, including Allandale, the East End, Painswick, Ardagh and Holly. No permit, no start. We also book every inspection before the next pour.

Who approves the work in Barrie

The City of Barrie takes residential permit applications through APLI, its online portal, with questions handled by Service Barrie.

Most of Barrie is in the Lake Simcoe watershed. Work near lakes, rivers, streams, steep slopes or wetlands can need a conservation authority permit, so check the regulation maps.

Waterproofed deep foundation walls with column forms, Toronto
Column rebar cage inside the forms

Barrie rules for additional units

Barrie allows up to four units per residential lot (three additional units plus the house), including detached units in accessory buildings, subject to zoning.

Whether it’s a garden suite, a new home or an addition, the work usually starts with concrete: new footings, foundation walls or a slab. We build that part to the approved drawings.

The process

How a Barrie foundation job runs

Poured trench footing with dowels for the wall, Toronto
  1. 1
    Share your drawings and the property address.
  2. 2
    We put a clear line-by-line price and the start dates in writing.
  3. 3
    We set out the layout from the survey and book each inspection.
  4. 4
    Footings, walls and slabs are formed and poured by our own crew.

FAQ

Questions from Barrie homeowners

Still have a question? Call us at (416) 785-7838 or send your drawings for a free quote.

Yes. We build footings, foundation walls and slabs for homes across Barrie, including Allandale, the East End, Painswick, Ardagh and Holly.

The City of Barrie takes residential permit applications through APLI, its online portal, with questions handled by Service Barrie.

Up to three additional units with the main house, including a detached unit, subject to zoning. Each needs a permit.

Not without approvals. Barrie doesn’t allow additional units in natural hazard areas without the right approvals.

We give you the start dates in writing with the quote, and work starts once the permit is issued.

Building in Barrie? We reply to drawings the same day.

Footings, foundation walls and slabs. Our own forms and crews, pour date in writing.

Nearby areas

Nearby, we also work in Orillia, Newmarket, Aurora, and across Toronto and the GTA.

Building soon in Barrie?

Send drawings or an address, and we’ll come back with what it needs and a start date.