Milton footings, foundation walls and slabs
Milton’s Building Services issues the permit through the Town’s online portal. Grand Structural Services (GSS) forms and pours footings and piers, poured and ICF foundation walls, and the garage and basement slabs that go on top, for new homes and additions in Old Milton, Timberlea, Dempsey and Beaty.
Takes 30 seconds. Upload your drawings for a faster price. We reply the same day.
Prefer to talk? Call (416) 785-7838
No waiting on rental stock or another crew
The date we give you is the date we pour
$2 million liability, certificates on request
Custom rebar and concrete at bulk pricing, one source
We pour concrete footings and piers, concrete foundation walls in poured concrete or ICF, and garage and basement slabs for homes and additions in Milton. For parking garages and commercial buildings, we also do concrete repair and parking garage restoration. Your engineer’s drawings set the work. Our own crews build it on our own forms. Before you build, read how deep footings go in Ontario and what a concrete foundation costs in Toronto, or see all the areas we serve.
From strip and pad footings to stepped footings and piers, for homes and additions in Milton. More on footings
We form and pour the foundation walls ourselves and add waterproofing and weeping tile. More on foundation walls
Slabs on grade, basement floors and suspended garage slabs. More on slabs
Footings to slab with one firm, so there’s no gap from one pour to the next.
Why us
Residential concrete in Milton: footings, foundation walls, and garage and basement slabs. Our own forms and crews, from footing to slab on one schedule.
01
No rental yard and no borrowed crew: we own the forms, so your pour stays on its date.
02
With footings, walls and slabs in one contract, there’s no hand-off gap and no fight over walls that aren’t square.
03
Built to your engineered drawings. Footings are inspected before every pour, and walls are checked against the drawings before we strip.
04
You’re dealing with a WSIB-cleared company with $2 million in liability insurance, and certificates come on request before we start.
Milton is a town in Halton Region. The Town’s Building Services issues the permit through its online portal.
The Niagara Escarpment rises on the west side of town, and part of that land is in the Niagara Escarpment Plan area. Sixteen Mile Creek runs through Milton toward Oakville. Conservation Halton regulates most of its valleys, and Credit Valley Conservation covers part of the town.
Newer subdivisions mean a lot of slab work. We pour garage and basement slabs on a compacted stone base, with the reinforcing the drawings call for.
Milton has grown fast, and many newer homes are adding basement units and garden suites. Older homes downtown are seeing additions that need new footings and foundation walls.
Milton has grown fast, and older homes downtown are adding additions that need new footings and walls.
Our crews work all over Milton, including Old Milton, Timberlea, Dempsey and Beaty. Once the permit is issued we start, booking each inspection before the next pour.
The Town of Milton Building Services issues the permit, and residential permits can be applied for, tracked and paid for through the Town’s online portal.
Milton is covered by Conservation Halton and Credit Valley Conservation, and the Niagara Escarpment runs through the west of the town. Additional units aren’t allowed in hazard areas or floodplains.
Since June 2024, Milton allows up to three additional residential units on a serviced urban lot (four units in total), including one in an accessory building. All units must be registered.
For a garden suite, an addition or a new home, the job tends to start with footings, foundation walls or a slab. We build those to the approved drawings.
How it works
FAQ
Didn’t see your question? Call us at (416) 785-7838 or send your drawings for a free quote.
Yes. We build footings, foundation walls and slabs for homes across Milton, including Old Milton, Timberlea, Dempsey and Beaty.
The Town of Milton Building Services issues the permit, and residential permits can be applied for, tracked and paid for through the Town’s online portal.
On a serviced urban lot, up to three additional units, one of which can be in an accessory building. Each needs a permit and registration with the Town.
We give you the start dates in writing with the quote, and work starts once the permit is issued.
Footings, walls and slabs by our own crews on our own forms, with the pour date in writing.
We build nearby too, in Oakville, Burlington, Brampton, and across Toronto and the GTA.
Start with the drawings or the address. We’ll reply with what it needs and when our crew can be there.