How we work
Every stage of a foundation is checked against the drawings, and every inspection is booked before the next pour.
Send your project address, current drawings and concrete scope for review.
Prefer to talk? Call (416) 785-7838
Forms and crews coordinated for your concrete scope
Timing confirmed around site readiness and required inspections
Inclusions and exclusions set out in your quotation
Reinforcing steel and concrete within the agreed package
We confirm timing around the agreed scope, site readiness, required inspections, weather and crew availability.
The price says line by line what is included and what isn’t.
We call for each inspection and don’t pour until it passes.
Ask for the current project documents and confirm requirements before work starts.
Why GSS
Every stage of a foundation is checked against the drawings, and every inspection is booked before the next pour. Here is exactly how a job runs with us.
01
Our forming system and crews help us coordinate the concrete work. Timing depends on drawings, site readiness, inspections, weather and availability.
02
Footings, walls and slabs can be included in one concrete package, with the scope and responsibilities confirmed in writing.
03
Built to your engineered drawings. Footings are inspected before every pour, and walls are checked against the drawings before we strip.
04
Your quotation identifies the concrete work included, exclusions and information needed before construction.
How it works
Layout, footings, footing inspection, walls, waterproofing and weeping tile, then the slab. Every stage is checked against the drawings, and every inspection is booked before the next pour. Still waiting on a permit? Read about common building permit delays in Toronto.
Footings, foundation walls and slabs, with forms and crews coordinated around the agreed scope.
FAQ
Can’t find your answer? Call us at (416) 785-7838 or send your drawings for review.
We do. Each inspection is booked and passed before the next pour.
Yes. We build to your stamped drawings and the Ontario Building Code.
With the price. The forming and pour dates are in writing from the start.
Send the drawings. We’ll walk you through the steps and the dates.