Burlington footings, foundation walls and slabs
Burlington homeowners and builders use Grand Structural Services (GSS) for footings and piers, poured and ICF foundation walls and garage and basement slabs. The City of Burlington Building Department issues the permit, and submissions are electronic only. We work in Aldershot, Roseland, Tyandaga and Millcroft, on our own forms and with our own crews.
Takes 30 seconds. Upload your drawings for a faster price. We reply the same day.
Prefer to talk? Call (416) 785-7838
No waiting on rental stock or another crew
The date we give you is the date we pour
$2 million liability, certificates on request
Custom rebar and concrete at bulk pricing, one source
We pour concrete footings and piers, concrete foundation walls in poured concrete or ICF, and garage and basement slabs for homes and additions in Burlington. For parking garages and commercial buildings, we also do concrete repair and parking garage restoration. We use our own crews and our own forms, and we follow your engineer’s drawings. Before you build, read how deep footings go in Ontario and what a concrete foundation costs in Toronto, or see all the areas we serve.
Footings for new homes and additions in Burlington: strip, pad, stepped and piers. More on footings
Walls poured on our own forms, then waterproofed, with weeping tile along the footing. More on foundation walls
Garage slabs, including suspended ones, plus basement slabs and slabs on grade. More on slabs
The same company does footings, walls and slab, with no wait between pours.
Why choose us
Residential concrete in Burlington: footings, foundation walls, and garage and basement slabs. Our own forms and crews, from footing to slab on one schedule.
01
We have our own forming system, so the pour isn’t waiting on a rental yard or another crew’s calendar.
02
Footings, walls and slabs sit in one contract, so there’s no gap between trades and no dispute over square walls.
03
Your engineered drawings set the work. Footings get inspected before each pour, and we check the walls against the drawings before the forms come off.
04
We’re WSIB cleared and carry $2 million in liability insurance. Ask for the certificates before we start.
Burlington is a city in Halton Region. Conservation Halton has its head office here.
The Niagara Escarpment runs through the north of the city. Land in the Niagara Escarpment Plan area can need a development permit from the Niagara Escarpment Commission before building work starts.
Creeks run from the escarpment down to the lake, and Conservation Halton regulates their valleys and floodplains. On rocky or sloped ground, the footing depth comes from the engineer, and we build to it.
Burlington has a mix of older homes in Aldershot and Roseland and newer homes in the north. Lots near the Niagara Escarpment or creeks can need conservation authority approval, which is worth confirming early.
Burlington mixes older homes in Aldershot and Roseland with newer homes in the north.
We build throughout Burlington, including Aldershot, Roseland, Tyandaga and Millcroft. Work starts once the permit is issued, and each inspection is booked before the next pour.
The City of Burlington Building Department issues the permit, and applications must be submitted electronically.
Lots near the creeks or the Niagara Escarpment can need conservation authority or Niagara Escarpment Commission approval. Check early if your lot is near either.
Burlington allows additional residential units on urban lots and has a look-up tool for detached units. The City notes that ARUs and tiny homes can need two permits.
Whether it’s a garden suite, a new home or an addition, the work usually starts with concrete: new footings, foundation walls or a slab. We build that part to the approved drawings.
Step by step
FAQ
Can’t find your answer? Call us at (416) 785-7838 or send your drawings for a free quote.
Yes. We build footings, foundation walls and slabs for homes across Burlington, including Aldershot, Roseland, Tyandaga and Millcroft.
The City of Burlington Building Department issues the permit, and applications must be submitted electronically.
On many urban lots, yes. Use the City’s look-up tool first, then the unit needs a building permit and a foundation sized for it.
Often. Lots in the Niagara Escarpment area can need a Niagara Escarpment Commission permit before the building permit.
We give you the start dates in writing with the quote, and work starts once the permit is issued.
Our own crews and forms for footings, walls and slabs, and the pour date in writing.
Send the drawings or the address. We’ll tell you what it needs and when our crew can start.