Concrete foundations across Toronto and the GTA
Clear scope|Written quotations
Clear scope|Written quotations

GSS guide

Top 5 Reasons for Building Permit Delays in Toronto

Footings, foundation walls and slabs in Toronto and the GTA.

Our own forms

Our own forming equipment

Pour date in writing

Given to you in writing.

$2 million liability insurance

Supply and install

Custom rebar and concrete from one source. Bulk pricing for builders.

For a new home or an addition in Toronto, a building permit delay pushes back everything: the site work, the foundation, the rest of the build and the move-in date. Most delays come from a handful of avoidable problems. Here are the five we see most, and how to avoid them.

1. Incomplete drawings

The most common cause is a set of drawings that leaves out details the examiner needs: footing sizes, foundation wall heights, beam and post sizes, or how the new work ties into the existing house. The City then asks for more information, and the clock stops until you answer.

How to avoid it: make sure your designer’s set covers the structure fully before it goes in. If part of the work needs an engineer, include the engineer’s drawings from the start.

New foundation walls with stone placed around them

2. Zoning problems

If a second storey is too tall, an addition is too close to the lot line, or the house covers too much of the lot, the permit can’t be issued as drawn. You may need a minor variance from the Committee of Adjustment, which can add several months.

How to avoid it: have your designer check zoning before the drawings are finished, not after.

3. Missing engineer documents

Some work needs a professional engineer. In Toronto, deep foundations often do: when the new footing goes below the neighbour’s, when the dig is deep, or when the soil is clay or silt. If the engineer’s design or forms are missing, the application stalls.

How to avoid it: confirm early whether your job needs an engineer.

Foundation walls stripped, with gravel inside

4. Drawings that don’t match each other

When the architectural and structural drawings disagree, the examiner will flag it. A common example is a new beam or post on one sheet that doesn’t appear on the other, or a load with no footing under it.

How to avoid it: one person should check that every sheet tells the same story before submission.

5. Slow answers to the examiner

When the examiner sends a list of comments, nothing moves until you respond in full. Partial answers lead to a second round, and a third.

How to avoid it: answer every comment at once, completely, and quickly.

What a delay really costs

  • Your site trades and foundation crew move to other jobs, and you wait for a new slot.
  • A spring start can slide into a winter pour, which needs heating and protection.
  • Rent, carrying costs and the move-in date all push back.

Before you apply

  • A current survey of the property.
  • Complete architectural and structural drawings that agree with each other.
  • Engineer’s drawings where the work needs them.
  • A zoning check on height, setbacks and lot coverage.

Request a foundation quote

Your designer handles the application. Send your drawings for a free quote while the permit is under review. See our footings and foundation walls pages.

We give you the pour date in writing. Get a free quote or call (416) 785-7838.

Get a free quote

Upload your drawings with your request. We reply within one business day.


Prefer to talk? Call (416) 785-7838

Why homeowners and builders choose GSS

Keep reading

More guides for homeowners and builders

Our projects

Recent work

Foundation work for a rear, side and garage extension in the GTA
Base prepared for a basement floor slab
New foundation walls, with a stone slinger placing gravel before the basement slab
Our wall forms and column cages on an industrial site
Long run of poured concrete walls on a large site
Deep foundation walls waterproofed, column forms beside them
Waterproofed deep foundation walls with column forms, Toronto
Foundation walls stripped with gravel placed inside, Toronto
Foundation walls stripped on a large home

More of our work

Poured foundation walls stripped, with a ladder down into the basement
Concrete walls and slab at a step in the foundation
Small concrete pit with waterproofing on the outside
Rebar tied for a concrete foundation wall in the GTA
Basement foundation walls stripped and ready for the slab
Poured concrete foundation wall face after the forms came off

Planning a foundation, an addition or a garden suite?

Send the drawings. We reply within one business day and build footing to slab on one schedule.