Concrete foundations across Toronto and the GTA
Clear scope|Written quotations
Clear scope|Written quotations

GSS guide

Strip Footings, Pad Footings and Pier Foundations Explained

Footings, foundation walls and slabs in Toronto and the GTA.

Our own forms

No waiting on rental stock or another crew

Pour date in writing

The date we give you is the date we pour

WSIB cleared and insured

$2 million liability, certificates on request

Supply and install

Custom rebar and concrete at bulk pricing, one source

Every foundation sits on footings. The type of footing depends on what it carries and the soil underneath. This guide explains strip footings, pad footings and pier foundations, and when each one is used on homes in Toronto.

What is a strip footing?

A strip footing is a continuous band of concrete that runs under a foundation wall. It spreads the weight of the wall and the house above along its full length, so the soil isn’t overloaded in any one spot. Most houses in Toronto sit on strip footings.

Concrete wall poured in a trench on a commercial job in the GTA
Concrete footings by Grand Structural Services.

What is a pad footing?

A pad footing is a single square or rectangular block of concrete under one point load, usually a steel post or a column inside the basement. The engineer sizes it for the load it carries.

What is a pier foundation?

A pier is a concrete column that reaches down to firm soil or below frost, with a footing at the bottom. Piers carry decks, porches, additions on poor soil and structures where a full basement isn’t needed. Grade beams often span between piers to carry walls.

Concrete stairs formed and reinforced, ready to pour
Concrete footings by Grand Structural Services.

Stepped footings

On a sloped lot, the footing steps down in sections instead of running at one level. Each step has to meet the code for height and overlap, and the forms have to be set accurately so the walls line up.

How deep do footings need to be in Toronto?

Footings have to sit below the frost line so the ground can’t heave them in winter. In Toronto that’s about 1.2 metres (4 feet) below finished grade for heated buildings, unless the engineer designs otherwise. The 2024 Ontario Building Code sets the minimums, and the engineer’s drawings set the actual size and reinforcing.

Inspections before the pour

The City inspects footings before any concrete goes in. The inspector checks the depth, the size, the soil and the reinforcing against the permit drawings. We book the inspection and pour only after it passes.

Questions people ask

Do footings need rebar?

Most do. The engineer specifies the bars, their size and their spacing. Where the drawings call for it, we fabricate the rebar to size ourselves.

Can you build footings in winter?

Yes, with care. The ground has to be protected from frost before and after the pour, and the concrete is heated and covered while it cures.

Need footings formed and poured?

Send us the drawings. We’ll form, reinforce and pour your concrete footings in Toronto on our own forms and give you the pour date in writing. Get a free quote or call (416) 785-7838.

Get a free quote

Takes 30 seconds. Upload your drawings for a faster price. We reply the same day.


Prefer to talk? Call (416) 785-7838

Why homeowners and builders choose GSS

Keep reading

More guides for homeowners and builders

Our projects

Recent work

Footing forms and rebar on pour day with the pump line in place
Footing forms beside an existing house for an addition in Toronto
Finishing a freshly poured concrete footing
Poured footing with rebar dowels for the foundation wall
Screeding the top of a concrete footing pour
Poured trench footing with dowels for the wall, Toronto
Concrete footings poured for a new home
Footing reinforcing set beside an existing foundation wall
Industrial foundation for a 16-foot-high retaining wall

More of our work

Footings and foundation for a double house in Toronto
Concrete footings for a home in the Beaches, Toronto
Rebar set for a suspended garage slab in the GTA
Rebar reinforcing for an industrial suspended slab
Concrete piers on an industrial project in Orillia, Ontario
Reinforcing detail for a retaining wall foundation
Concrete footing forms and rebar ready for the pour in Toronto
Reinforced concrete retaining wall
Reinforced footing forms set inside a building
Concrete footings formed for a new home in Toronto
Footing forms set for a new foundation in the GTA
Footing forms laid out on a new home dig in the GTA
Footings poured while the crew finishes up
Footing rebar laid in a long trench
Footing forms set below grade for a deep basement
Footing forms and rebar on pour day with the pump line in place
Footing forms beside an existing house for an addition in Toronto
Finishing a freshly poured concrete footing
Poured footing with rebar dowels for the foundation wall
Screeding the top of a concrete footing pour
Footings poured with rebar dowels set for the foundation walls
Poured trench footing with dowels for the wall, Toronto
Concrete footings poured for a new home
Footing reinforcing set beside an existing foundation wall
Industrial foundation for a 16-foot-high retaining wall
Concrete wall poured in a trench on a commercial job in the GTA
Concrete stairs formed and reinforced, ready to pour
Footing forms with rebar mats set

Planning a foundation, an addition or a garden suite?

Send the drawings. We reply the same day and build footing to slab on one schedule.