Slab work
A basement floor is only as good as what sits under it. Grand Structural Services (GSS) pours basement floor slabs across Toronto and the GTA: compacted granular base, vapour barrier, insulation where the design calls for it, reinforcing, then a level finish our own crews place. Built to the engineer’s drawings and the Ontario Building Code.
Send your project address, current drawings and concrete scope for review.
Prefer to talk? Call (416) 785-7838
Forms and crews coordinated for your concrete scope
Timing confirmed around site readiness and required inspections
Inclusions and exclusions set out in your quotation
Reinforcing steel and concrete within the agreed package
A basement concrete floor is a slab poured over a compacted stone base and a vapour barrier, with rigid insulation where the drawings call for it. The plumbing under the slab goes in and is inspected first. We pour and finish it level, to the thickness on your drawings.
Compacted granular base to the depth on the drawings, so the floor doesn’t settle or crack.
Placed as your drawings call for, to keep moisture and cold out of the finished basement.
Drains and rough-ins go in before the pour, through our own plumber, so the pour isn’t held up.
Poured and finished level, with the edges and any thickened sections formed as drawn.
Why GSS
A basement floor is only as good as what is under it. We prepare the base, vapour barrier and insulation your drawings call for, handle the under-slab plumbing, and pour a level floor the next trade can work on.
01
Our forming system and crews help us coordinate the concrete work. Timing depends on drawings, site readiness, inspections, weather and availability.
02
Footings, walls and slabs can be included in one concrete package, with the scope and responsibilities confirmed in writing.
03
Built to your engineered drawings. Footings are inspected before every pour, and walls are checked against the drawings before we strip.
04
Your quotation identifies the concrete work included, exclusions and information needed before construction.
On a new home, the basement floor goes in once the walls are up and the under-slab work is done.
Either way, we pour it on the same schedule as the rest of our work, so there is no wait for a separate slab crew. Finishing the basement as an apartment? Read our guide to legal basement ceiling height.
Footings, foundation walls and slabs, with forms and crews coordinated around the agreed scope.
FAQ
Can’t find your answer? Call us at (416) 785-7838 or send your drawings for review.
It’s set by your drawings and the Ontario Building Code for the use of the space. We pour to the thickness specified.
Yes, through our own plumber, so the pour isn’t waiting on another trade.
Your heating trade lays the tubing; we pour the slab over it to the drawings.
Yes. We pour garage slabs, including suspended garage slabs over a cold cellar, and slabs on grade, on the same schedule as the basement floor.
Part of our garage, basement and on-grade slab service.
Send them over. We’ll price the floor with the rest of your foundation.