Concrete foundations across Toronto and the GTA
Clear scope|Written quotations
Clear scope|Written quotations

GSS guide

Legal Basement Apartment Ceiling Height in Toronto and Ontario

Footings, foundation walls and slabs in Toronto and the GTA.

Our own forms

Our own forming equipment

Pour date in writing

Given to you in writing.

$2 million liability insurance

Supply and install

Custom rebar and concrete from one source. Bulk pricing for builders.

If you are turning your basement into a legal second unit in Toronto, ceiling height is usually the first thing that decides whether the plan works. Many older Toronto houses have basements that are too low. This guide explains the minimum height in the Ontario Building Code, how to measure yours, and what to do if it falls short.

The minimum ceiling height

For a basement secondary suite, the Ontario Building Code sets a minimum ceiling height of 1.95 m, and 1.85 m under beams and ducting (Division B, 9.5.3). That is about 6 ft 5 in and 6 ft 1 in.

Ceiling height is not the only rule. A legal unit also needs fire separation, egress windows or a separate exit, and room sizes that meet the code. Your designer and the City’s building department will confirm what applies to your house. Older buildings can sometimes use the compliance options for existing buildings in the code.

Foundation walls stripped with gravel placed inside, Toronto

How to measure your basement

  1. Measure from the top of the finished floor to the underside of the finished ceiling, not the joists.
  2. Measure under the lowest beams and ducts separately.
  3. Allow for the new floor and ceiling. Insulation, subfloor and drywall all take height.

If your basement is too low

You have two options:

  • Benching: lower the floor and leave a concrete ledge along the walls. Cheaper, but you lose floor space.
  • Rerouting ducts and beams: sometimes enough on its own if the problem is only a low beam or duct run.

GSS does not lower existing basements; we pour basement floors for new homes and additions.

Foundation work for a rear, side and garage extension in the GTA

Don’t forget the entrance

Many second units need a separate entrance. Plan it with your designer from the start.

Questions homeowners ask

What is the minimum basement ceiling height in Ontario for a second unit?

1.95 m, and 1.85 m under beams and ducts, under the Ontario Building Code (Division B, 9.5.3). Confirm with your designer for your house.

Can I build a legal basement apartment with a 6-foot ceiling?

Not without lowering the floor or raising problem areas. 6 feet is about 1.83 m, which is under the 1.95 m minimum.

Building a new basement?

Building an addition or a new home with a basement? Send the drawings and we’ll price the footings, walls and basement floor concrete. Get a free quote or call (416) 785-7838.

Get a free quote

Upload your drawings with your request. We reply within one business day.


Prefer to talk? Call (416) 785-7838

Why homeowners and builders choose GSS

Keep reading

More guides for homeowners and builders

Our projects

Recent work

Base prepared for a basement floor slab
Foundation walls stripped with gravel placed inside, Toronto
Our wall forms and column cages on an industrial site
Long run of poured concrete walls on a large site
Deep foundation walls waterproofed, column forms beside them
Waterproofed deep foundation walls with column forms, Toronto
Foundation work for a rear, side and garage extension in the GTA
Waterproofing membrane on new concrete foundation walls in the GTA
Foundation walls stripped on a large home

More of our work

Poured foundation walls stripped, with a ladder down into the basement
Concrete walls and slab at a step in the foundation
Small concrete pit with waterproofing on the outside
Rebar tied for a concrete foundation wall in the GTA
Basement foundation walls stripped and ready for the slab
Poured concrete foundation wall face after the forms came off

Planning a foundation, an addition or a garden suite?

Send the drawings. We reply within one business day and build footing to slab on one schedule.